Self-Leveling Compound Calculator
A 10×12 ft floor (120 sq ft) poured at an average 1/4 in. needs 2.5 cu ft of self-leveling compound. With a 50-lb bag rated 45 sq ft at 1/8 in., that is 5.3 bags, so buy six with 10% extra and plan about 33 quarts (8.25 gallons) of mixing water.
Formulas and figures reviewed · How we check our calculators
1 · Project Specifications
Floor Size
Only used when Measure By is set to Known total area.
Depth
Lay a long straightedge across the floor, measure the gaps every 2–3 ft and average them. 1/8 in. = 3 mm, 1/4 in. = 6 mm.
Used only to check the product's maximum thickness per pour. Enter 0 to skip.
Product
Match the way your bag or data sheet states coverage.
Typical 50-lb bag: 40–50 sq ft at 1/8 in. Typical 25 kg bag: about 5 m² at 3 mm, or 1.5–1.8 kg/m²/mm.
From the bag directions. Most 50-lb bags take 5–6 US quarts (4.7–5.7 L).
Options
Covers low spots you missed, material left in the bucket and flow into gaps. 10% is typical.
2 · Material Estimates
Example result for the default values. Enter your own measurements and press Calculate.
Estimation Results
Whole bags including the waste allowance.
Bags × water per bag. Measure exactly per bag; extra water weakens the surface.
✓ Recommendations
Mix one bag at a time with a drill and paddle for about 2 minutes, then pour while the previous batch is still wet so the edges blend.
Prime the substrate with the manufacturer's primer and seal gaps and floor drains first; unprimed concrete or wood pulls water from the mix and causes pinholes and weak spots.
Notes
Coverage used: 0.469 cu ft (13.3 L) per 50-lb (22.7 kg) bag, about 1.71 kg/m²/mm. Exact requirement before rounding: 5.87 bags.
Cost estimate (optional)Add prices
Add primer, which most products require. Enter your local prices; quantities include the waste allowance where the calculator adds one. Delivery, tax and labor are not included.
Detailed Project Guide & Calculation Methodology
Calculation Formulas & Methodology
Pour Volume
Volume (cu ft) = Area (sq ft) × Avg Depth (in) ÷ 12 × (1 + Waste%)Self-leveler fills a volume, so area alone is not enough. In metric, liters = m² × depth (mm), because 1 m² at 1 mm is exactly 1 liter.
Step-by-step
- 1120 sq ft × 0.25 in ÷ 12 = 2.50 cu ft
- 22.50 × 1.10 = 2.75 cu ft (78 L)
Bag Yield from Printed Coverage
Yield (cu ft) = Coverage at 1/8 in. (sq ft) × 0.125 ÷ 12Bags quote coverage at a reference depth. A bag rated 45 sq ft at 1/8 in. fills 45 × 0.0104 = 0.469 cu ft (13.3 L). For metric bags rated in m² at 3 mm, yield (L) = m² × 3; for a kg/m²/mm rate, yield (L) = bag kg ÷ rate.
Bags and Water
Bags = ⌈Volume ÷ Yield⌉; Water = Bags × Water per BagExample: 2.75 ÷ 0.469 = 5.87, so 6 bags. At 5.5 qt per bag, water = 33 qt (8.25 gal, 31 L).
How It Works
- 1Enter the floor length and width, or a known area in sq ft or m².
- 2Enter the average depth you need to fill, and optionally the deepest spot.
- 3Choose how your bag states coverage (sq ft at 1/8 in., m² at 3 mm, or kg/m²/mm) and type the number from the bag.
- 4Enter the bag weight and water per bag from the directions.
- 5Set a waste allowance (10% is typical) and read bags, volume, weight and water.
Self-Leveler Coverage Chart by Depth
Coverage for a typical 50-lb bag rated 45 sq ft at 1/8 in. (about 0.47 cu ft or 13.3 L per bag). Bags per 100 sq ft include 10% waste. For a product rated 40 or 50 sq ft at 1/8 in., scale the coverage by 40 ÷ 45 or 50 ÷ 45.
| Average depth | Volume per 100 sq ft | Coverage per 50-lb bag | Bags per 100 sq ft (+10%) |
|---|---|---|---|
| 1/8 in. (3 mm) | 1.04 cu ft | 45 sq ft | 3 |
| 3/16 in. (5 mm) | 1.56 cu ft | 30 sq ft | 4 |
| 1/4 in. (6 mm) | 2.08 cu ft | 22.5 sq ft | 5 |
| 3/8 in. (10 mm) | 3.13 cu ft | 15 sq ft | 8 |
| 1/2 in. (13 mm) | 4.17 cu ft | 11.3 sq ft | 10 |
| 3/4 in. (19 mm) | 6.25 cu ft | 7.5 sq ft | 15 |
| 1 in. (25 mm) | 8.33 cu ft | 5.6 sq ft | 20 |
Coverage halves each time depth doubles. Always confirm the figure on your bag.
Published Coverage for Common Products
Figures from manufacturer data sheets and labels for estimating only. Formulations change, so check the current data sheet before you buy.
| Product | Bag size | Coverage at 1/8 in. (3 mm) | Water per bag |
|---|---|---|---|
| Mapei Ultraplan Easy | 50 lb (22.7 kg) | about 48 sq ft (4.5 m²) | 5.75–6 qt (5.4–5.7 L) |
| Custom Building Products LevelQuik RS | 50 lb (22.7 kg) | about 40 sq ft (3.7 m²) | 5.25–5.75 qt (5.0–5.4 L) |
| Henry 555 LevelPro | 40 lb (18.1 kg) | about 40–43 sq ft (3.7–4.0 m²) | about 5 qt (4.7 L) |
| Ardex K 15 | 55 lb (25 kg) | about 30 sq ft at 1/4 in. (2.8 m² at 6 mm) | 7 qt (6.6 L) |
Enter your product's numbers in the calculator; the default (45 sq ft per 50-lb bag at 1/8 in., 5.5 qt water) is a midpoint.
Metric Levelling Compound Table
Cement-based levelling compounds typically use about 1.7 kg of powder per m² for each mm of depth (the range is roughly 1.5 to 1.8). One m² at 1 mm is 1 liter of volume.
| Depth | Powder per m² | m² per 25 kg bag | m² per 20 kg bag |
|---|---|---|---|
| 3 mm | 5.1 kg | 4.9 m² | 3.9 m² |
| 5 mm | 8.5 kg | 2.9 m² | 2.4 m² |
| 10 mm | 17 kg | 1.5 m² | 1.2 m² |
| 15 mm | 25.5 kg | 1.0 m² | 0.8 m² |
| 20 mm | 34 kg | 0.7 m² | 0.6 m² |
Based on 1.7 kg/m²/mm, before waste. Use the calculator's kg/m²/mm option with your product's rate.
Frequently Asked Questions
Multiply the floor area by the average depth to get volume, then divide by what one bag fills. A 10×12 ft floor at an average 1/4 in. is 120 × 0.25 ÷ 12 = 2.5 cu ft. A 50-lb bag rated 45 sq ft at 1/8 in. fills about 0.47 cu ft, so you need 5.3 bags, or six after adding 10% for waste.
Most 50-lb bags cover 40 to 50 sq ft at 1/8 in. (3 mm). Mapei Ultraplan Easy lists about 48 sq ft and Custom LevelQuik RS about 40 sq ft. Coverage halves each time the depth doubles: a 45 sq ft bag covers 22.5 sq ft at 1/4 in., 11 sq ft at 1/2 in. and about 5.6 sq ft at 1 in.
Use the exact amount on the bag, usually 5 to 6 US quarts (4.7 to 5.7 L) per 50-lb bag. Mapei Ultraplan Easy calls for 5.75 to 6 qt and LevelQuik RS 5.25 to 5.75 qt per 50 lb. Measure with a marked bucket for every bag; extra water makes the surface weak and dusty and can cause cracking.
Most products go from 1/8 in. (3 mm) up to about 1 to 1-1/2 in. (25–38 mm) in one pour. Some allow deeper fills when extended with clean pea gravel, and deep-fill versions are made for thicker pours. Below 1/8 in. the material is too thin to flow and bond well, so use a feather-edge patch instead.
One square meter at 1 mm deep is 1 liter of volume. Most cement self-levelers use about 1.5 to 1.8 kg of powder per m² per mm. A 15 m² floor at an average 5 mm uses roughly 15 × 5 × 1.7 = 128 kg, or six 25 kg bags with 10% extra. A 25 kg bag covers about 5 m² at 3 mm.
Lay a 6 to 10 ft straightedge or laser line across the floor in a grid, measure the gap under it every 2 to 3 ft, and average the readings, counting high spots as zero. If half the floor needs 1/2 in. and the rest needs almost nothing, the average is about 1/4 in. Use the deepest reading separately to check the maximum pour thickness.
Almost every manufacturer requires its primer on concrete and wood. Primer stops the substrate from absorbing water out of the mix, which causes pinholes, air bubbles and poor bond. Wood subfloors usually also need metal lath and a minimum thickness, often 1/4 to 3/8 in. Check the data sheet for your exact product.
✓ Pro Tips
- •Measure the depth on a grid instead of guessing. Floors that look flat often average 1/8 to 1/4 in. of correction, and doubling the depth doubles the bags.
- •Buy one or two extra bags beyond the result. Stopping mid-pour to fetch more leaves a cold joint ridge that has to be ground flat.
- •Dam off doorways, floor registers and gaps along walls with foam backer rod or tape so the compound does not run away under walls.
- •Keep the room between roughly 50 and 85 °F (10–30 °C) and out of direct sun and drafts during the pour, or the surface can skin and crack.
- •Use a gauge rake or smoother set to your target depth and walk in spiked shoes so you can work the pour without leaving footprints.
⚠ Common Mistakes
- •Calculating from area only. A bag rated 45 sq ft at 1/8 in. covers just 22.5 sq ft at 1/4 in.
- •Adding extra water to make it flow farther. It weakens the surface, causes dusting and cracking, and voids most warranties.
- •Skipping primer. Unprimed concrete or plywood soaks water from the mix, leaving pinholes and a poor bond.
- •Pouring too thin. Below 1/8 in. (3 mm) self-leveler does not flow or bond reliably; use a patch compound for skim coats.
- •Mixing too many bags at once. Work time is short, so mix bag by bag and keep a wet edge.
Share Your Estimate
Related Calculators
Estimate the number of planks and boxes needed to install hardwood, laminate, or LVP flooring in any room.
flooringCalculate the exact number of tiles and boxes required to cover any floor or wall, accounting for grout gaps and a waste allowance.
flooringEstimate deck mud, floor mud or sand-cement screed for shower pans and tile mortar beds: volume, bags of pre-mix, or portland cement and sand for a 4:1 or 5:1 site mix.
flooringPlanning Guides & Advice
- How Much Deck Mud Do I Need for a Shower or Floor?
Calculate deck mud (dry-pack mortar) for shower pans and floor mud beds: mix ratios, slope, thickness, bag yields, a bags-per-shower-size table and metric sand and cement screed quantities.
- Concrete Resurfacer Coverage: How Thick and How Many Bags?
How far a 40 lb bag of concrete resurfacer goes at 1/16, 1/8 and 1/4 in., bags for patios, driveways and steps, one coat vs two, surface prep, temperatures and when resurfacing won't work.
DIY Estimation Checklist
- •Measure lengths and heights twice for accuracy.
- •Check product labels for actual coverage rates.
- •Order materials with a 10% buffer for cuts and waste.
- •Account for doors, windows, and obstacles.
- •Compare quotes from at least two suppliers.