Deck Mud Calculator (Mortar Bed & Floor Mud)
A 5×5 ft shower floor sloped from 3/4 in. at a center drain to 1-1/2 in. at the walls averages 1.25 in. thick and needs about 2.6 cu ft of deck mud, or 2.86 cu ft with 10% waste. That is five 80-lb bags of sand mix, or one 94-lb bag of portland plus about 290 lb of sand mixed 5:1.
Formulas and figures reviewed · How we check our calculators
1 · Project Specifications
Floor Size
Use Length × Width for a rectangular floor; use total area for L-shaped or irregular floors.
Inside length of the shower or floor (wall to wall, or curb to wall).
Inside width of the shower or floor.
Only used when Measure By is set to Known total area.
Thickness
Shower pans slope to the drain; floor beds and screeds are usually a uniform thickness.
Sloped beds only. Keep at least 3/4 in. (19 mm) at the drain.
Sloped beds only. Drain thickness + 1/4 in. per foot of run to the farthest wall.
Flat beds only. Typical: 3/4–2 in. for tile mortar beds; 50–75 mm for sand-cement screeds.
Mix
Bag yields are typical published figures. Check your bag and use Other if it differs.
Cubic feet per bag from the bag label (1 cu ft = 28.3 L). Used only with Other bag.
Options
Covers compaction, low spots and mud left in the bucket. 10% is typical.
2 · Material Estimates
Example result for the default values. Enter your own measurements and press Calculate.
Estimation Results
Bags of the selected mix (or portland cement bags for a site mix), waste included.
Average bed thickness used for the volume.
Loose sand for a site mix.
Approximate weight of dry sand for a site mix.
Slope implied by your thicknesses and floor size.
✓ Recommendations
Plan for 2.86 cu ft of mud over 25.0 sq ft at an average 1.25 in.
Notes
Sand mix (sand/topping mix) works as deck mud when mixed with less water than the bag directions, to a damp-sand consistency that holds together when squeezed.
Detailed Project Guide & Calculation Methodology
Calculation Formulas & Methodology
Average Thickness of a Sloped Shower Pan
Center drain: T_avg = T_drain + ⅔ × (T_wall − T_drain) | Linear drain: T_avg = (T_drain + T_wall) ÷ 2A center-drain pan is four sloped planes meeting at the drain, so most of the floor area sits near the thick perimeter. Averaged over the floor, the thickness lands two-thirds of the way from the drain value to the wall value. A linear drain gives one flat sloped plane, so the average is the simple midpoint.
Step-by-step
- 1Example: 3/4 in. at the drain, 1-1/2 in. at the walls, center drain.
- 2T_avg = 0.75 + ⅔ × (1.5 − 0.75) = 0.75 + 0.50 = 1.25 in.
Mud Volume
Volume (cu ft) = Area (sq ft) × T_avg (in) ÷ 12 × (1 + Waste%)Converts the average thickness to feet and multiplies by floor area. Divide cubic feet by 27 for cubic yards, or multiply by 0.0283 for cubic meters. In metric: m³ = m² × thickness (mm) ÷ 1,000.
Step-by-step
- 125 sq ft × 1.25 ÷ 12 = 2.60 cu ft
- 22.60 × 1.10 waste = 2.86 cu ft (0.081 m³)
Bags of Pre-Mix
Bags = ⌈Volume ÷ Bag Yield⌉Typical yields: 80-lb sand mix ≈ 0.66 cu ft, 60-lb sand mix ≈ 0.50 cu ft, 55-lb pre-blended mud bed mix ≈ 0.45 cu ft. Example: 2.86 ÷ 0.66 = 4.3, so buy 5 bags.
Site-Mixed Deck Mud (4:1 or 5:1)
Sand (cu ft) ≈ Volume; Portland (cu ft) = Sand ÷ Ratio; 94-lb bags = ⌈Portland cu ft⌉Semi-dry deck mud packs down so the finished bed takes up about the same volume as the loose sand; the cement fills the gaps between sand grains. One 94-lb bag of portland is 1 cu ft. Sand weighs roughly 100 lb per cu ft (1,600 kg/m³) dry and loose.
How It Works
- 1Enter the floor length and width, or a known total area in sq ft or m².
- 2Choose the bed shape: sloped to a center drain, sloped to a linear drain, or flat.
- 3For a sloped pan, enter the thickness at the drain and at the walls; for a flat bed, enter the uniform thickness (in, mm or cm).
- 4Pick a mix: 80-lb or 60-lb sand mix, 55-lb mud bed mix, your own bag yield, or a 4:1 or 5:1 site mix.
- 5Set a waste allowance (10% is typical) and read the volume, bag count, sand quantity and slope check.
Deck Mud Coverage per Bag by Thickness
Square feet covered by one bag at each bed thickness, before waste. Yields are typical published figures: 80-lb sand mix about 0.66 cu ft (Quikrete Sand/Topping Mix data sheet), 60-lb sand mix about 0.50 cu ft, and 55-lb pre-blended mud bed mix about 0.45 cu ft (Mapei lists 5 to 6 sq ft per bag at 1 in.).
| Thickness | Cu ft per 100 sq ft | 80-lb bag (0.66 cu ft) | 60-lb bag (0.50 cu ft) | 55-lb mud bed mix (0.45 cu ft) |
|---|---|---|---|---|
| 3/4 in. (19 mm) | 6.25 | 10.6 sq ft | 8.0 sq ft | 7.2 sq ft |
| 1 in. (25 mm) | 8.33 | 7.9 sq ft | 6.0 sq ft | 5.4 sq ft |
| 1-1/4 in. (32 mm) | 10.42 | 6.3 sq ft | 4.8 sq ft | 4.3 sq ft |
| 1-1/2 in. (38 mm) | 12.50 | 5.3 sq ft | 4.0 sq ft | 3.6 sq ft |
| 2 in. (51 mm) | 16.67 | 4.0 sq ft | 3.0 sq ft | 2.7 sq ft |
| 2-1/2 in. (64 mm) | 20.83 | 3.2 sq ft | 2.4 sq ft | 2.2 sq ft |
Coverage = bag yield ÷ (thickness in inches ÷ 12). Divide your floor area by the coverage and round up.
Shower Pan Mud Quantities by Size
Center-drain pans sloped from 3/4 in. at the drain to 1-1/2 in. at the walls (average 1.25 in.), with 10% waste. For a site mix, the 5:1 column shows portland cement in cubic feet; one 94-lb bag is 1 cu ft, so every size up to 5×6 ft needs a single bag.
| Shower size | Area | Mud with 10% waste | 80-lb bags | 60-lb bags | 5:1 site mix |
|---|---|---|---|---|---|
| 3 × 3 ft | 9 sq ft | 1.03 cu ft | 2 | 3 | 0.21 cu ft portland + 103 lb sand |
| 3 × 5 ft | 15 sq ft | 1.72 cu ft | 3 | 4 | 0.34 cu ft portland + 172 lb sand |
| 4 × 4 ft | 16 sq ft | 1.83 cu ft | 3 | 4 | 0.37 cu ft portland + 183 lb sand |
| 4 × 6 ft | 24 sq ft | 2.75 cu ft | 5 | 6 | 0.55 cu ft portland + 275 lb sand |
| 5 × 5 ft | 25 sq ft | 2.86 cu ft | 5 | 6 | 0.57 cu ft portland + 286 lb sand |
| 5 × 6 ft | 30 sq ft | 3.44 cu ft | 6 | 7 | 0.69 cu ft portland + 344 lb sand |
Wider or longer showers need a thicker wall edge to keep 1/4 in. per foot of slope, so check the slope result for your size.
Metric Screed Calculator Table (per m²)
For a flat sand-cement screed, volume per square meter equals the thickness in meters. Quantities below are for a 4:1 sharp sand to cement mix, using about 1,600 kg/m³ for loose sand and 1,500 kg/m³ for cement, before waste. UK guidance (BS 8204) generally gives minimum screed thicknesses of about 25 mm bonded, 50 mm unbonded and 65 mm floating.
| Screed thickness | Volume per m² | Sand per m² | Cement per m² | Per 10 m² |
|---|---|---|---|---|
| 25 mm | 0.025 m³ | 40 kg | 9.4 kg | 0.40 t sand + 3.8 × 25 kg cement |
| 40 mm | 0.040 m³ | 64 kg | 15.1 kg | 0.64 t sand + 6.0 × 25 kg cement |
| 50 mm | 0.050 m³ | 80 kg | 18.8 kg | 0.80 t sand + 7.5 × 25 kg cement |
| 65 mm | 0.065 m³ | 104 kg | 24.5 kg | 1.04 t sand + 9.8 × 25 kg cement |
| 75 mm | 0.075 m³ | 120 kg | 28.2 kg | 1.20 t sand + 11.3 × 25 kg cement |
Add 10% for waste and compaction. Underfloor heating screeds and proprietary screeds follow the manufacturer's thickness rules.
Worked Example: Sloped Shower Pan
- •Shower: 5 × 5 ft, center drain, so area = 25 sq ft (2.32 m²).
- •Run from drain to wall = 2.5 ft. At 1/4 in. per foot the walls must be at least 0.75 + 0.625 = 1.375 in.; round up to 1.5 in.
- •Average thickness = 0.75 + ⅔ × (1.5 − 0.75) = 1.25 in. (32 mm).
- •Volume = 25 × 1.25 ÷ 12 = 2.60 cu ft; with 10% waste 2.86 cu ft (0.081 m³, 81 L).
- •80-lb sand mix: 2.86 ÷ 0.66 = 4.3, so 5 bags. 60-lb: 2.86 ÷ 0.50 = 5.7, so 6 bags.
- •5:1 site mix: 2.86 cu ft of sand (about 286 lb) and 2.86 ÷ 5 = 0.57 cu ft of portland, so one 94-lb bag.
Frequently Asked Questions
Multiply the floor area by the average bed thickness. A 5×5 ft shower with a center drain, 3/4 in. thick at the drain and 1-1/2 in. at the walls, averages 1.25 in., so it needs 25 × 1.25 ÷ 12 = 2.6 cu ft. With 10% waste that is 2.86 cu ft: five 80-lb bags of sand mix, six 60-lb bags, or one 94-lb bag of portland plus about 2.9 cu ft (290 lb) of sand for a 5:1 site mix.
An 80-lb bag of sand mix yields about 0.66 cu ft. That covers roughly 10.6 sq ft at 3/4 in., 7.9 sq ft at 1 in., 6.3 sq ft at 1-1/4 in., 5.3 sq ft at 1-1/2 in., and 4 sq ft at 2 in. A 55-lb bag of pre-blended mud bed mix (about 0.45 cu ft) covers 5 to 6 sq ft at 1 in., which matches the manufacturer coverage charts.
Deck mud is 4 or 5 parts sand to 1 part portland cement by volume, mixed with just enough water that a squeezed handful holds its shape without water seeping out. A 5:1 batch uses one 94-lb bag of portland (1 cu ft) with 5 cu ft of sand, about 500 lb, and makes roughly 5 cu ft of packed mud. A 4:1 mix is a little stronger and easier to float smooth.
Keep at least 3/4 in. (19 mm) at the thinnest point, usually the drain, because thinner mortar cracks and breaks apart. From there the floor rises 1/4 in. per foot toward the walls, the code minimum slope. A shower with a 2.5 ft run from drain to wall therefore needs about 1-3/8 in. at the wall, and most installers round up to 1-1/2 in.
For a center drain, add two-thirds of the difference between the wall and drain thickness to the drain thickness: 0.75 + ⅔ × (1.5 − 0.75) = 1.25 in. A simple midpoint (1.125 in.) underestimates because most of the floor area lies near the thick perimeter. For a linear drain along one wall, the floor is a single sloped plane, so the midpoint is correct.
Volume per square meter equals the thickness in meters, so a 50 mm screed is 0.05 m³ per m². At a 4:1 sand-to-cement mix that is about 80 kg of sharp sand and 19 kg of cement per m². A 10 m² floor at 50 mm needs 0.5 m³, roughly 0.8 tonnes of sand and 7.5 bags of 25 kg cement, plus 10% for waste and compaction.
Yes. Bagged sand mix (sand/topping mix) is a pre-blended mix of sand and portland cement with no gravel, and many tile setters use it for shower pans. Mix it much drier than the bag directions, to a damp-sand consistency, then pack and screed it. An 80-lb bag yields about 0.66 cu ft. Pre-blended mud bed mixes cost more but are formulated to the 4:1 ratio.
Use a mud bed when you need slope, such as a shower pan, or a bed thicker than about 3/4 in. that you can build up in one pass. Use self-leveling compound for flat floors that need 1/8 in. to about 1 in. of correction. Self-leveler flows flat, so it cannot form a slope to a drain, and it costs more per cubic foot.
✓ Pro Tips
- •Work out the wall thickness from the slope: drain thickness + 1/4 in. for every foot from the drain to the farthest wall. A 3×5 ft shower with a center drain has a 2.5 ft run, so 3/4 in. at the drain needs about 1-3/8 in. at the far walls.
- •Mix deck mud to a damp-sand consistency. If you squeeze a handful it should hold together and leave your palm only slightly damp; wet mud slumps and will not hold a slope.
- •Pack the mud hard with a wood float or tamper before screeding. Loose mud settles under tile and leaves hollow spots.
- •Mark the finished height on the walls (a level line at the perimeter) and set a screed guide around the drain so the slope stays even.
- •Buy one extra bag. Running short mid-bed leaves a cold joint, and leftover bags keep well if stored dry.
⚠ Common Mistakes
- •Using the midpoint of drain and wall thickness for a center-drain pan. The real average is two-thirds of the way toward the wall value, so the midpoint shorts you by about 10%.
- •Going thinner than 3/4 in. at the drain. Thin edges of mortar crumble under foot traffic and crack the tile above.
- •Adding too much water. Deck mud is not concrete; a pourable mix shrinks, cracks and cannot be shaped to a slope.
- •Using play sand. Its fine, rounded grains make weak mud; use mason sand or sharp (concrete) sand.
- •Forgetting the pre-slope in a traditional liner shower. The mortar bed under the liner needs its own 1/4 in. per foot slope, so you buy mud for two layers.
Share Your Estimate
Related Calculators
Calculate the exact number of tiles and boxes required to cover any floor or wall, accounting for grout gaps and a waste allowance.
flooringWork out how many bags of self-leveling compound (self-leveler, floor leveler) you need from floor area, average depth and the coverage printed on the bag, plus mixing water.
flooringFind how many rolls of foam, cork or combo underlayment, or 6-mil poly vapor barrier, you need for a room, including seam overlaps, wall turn-ups, waste and seam tape.
flooringPlanning Guides & Advice
- How Much Deck Mud Do I Need for a Shower or Floor?
Calculate deck mud (dry-pack mortar) for shower pans and floor mud beds: mix ratios, slope, thickness, bag yields, a bags-per-shower-size table and metric sand and cement screed quantities.
DIY Estimation Checklist
- •Measure lengths and heights twice for accuracy.
- •Check product labels for actual coverage rates.
- •Order materials with a 10% buffer for cuts and waste.
- •Account for doors, windows, and obstacles.
- •Compare quotes from at least two suppliers.