Deck Mud Calculator (Mortar Bed & Floor Mud)

A 5×5 ft shower floor sloped from 3/4 in. at a center drain to 1-1/2 in. at the walls averages 1.25 in. thick and needs about 2.6 cu ft of deck mud, or 2.86 cu ft with 10% waste. That is five 80-lb bags of sand mix, or one 94-lb bag of portland plus about 290 lb of sand mixed 5:1.

Formulas and figures reviewed · How we check our calculators

Deck mud (also called floor mud, dry-pack mortar or, in the UK and Australia, sand-cement screed) is a stiff blend of sand and portland cement used to build sloped shower pans and flat mortar beds under tile. This calculator works out the average thickness of a sloped or flat bed, the volume of mud, and how many bags of pre-mix or how much cement and sand you need for a site mix, in imperial or metric units.

1 · Project Specifications

Floor Size

Use Length × Width for a rectangular floor; use total area for L-shaped or irregular floors.

5

Inside length of the shower or floor (wall to wall, or curb to wall).

5

Inside width of the shower or floor.

25

Only used when Measure By is set to Known total area.

Thickness

Shower pans slope to the drain; floor beds and screeds are usually a uniform thickness.

0.75

Sloped beds only. Keep at least 3/4 in. (19 mm) at the drain.

1.5

Sloped beds only. Drain thickness + 1/4 in. per foot of run to the farthest wall.

1.25

Flat beds only. Typical: 3/4–2 in. for tile mortar beds; 50–75 mm for sand-cement screeds.

Mix

Bag yields are typical published figures. Check your bag and use Other if it differs.

0.5 cu ft

Cubic feet per bag from the bag label (1 cu ft = 28.3 L). Used only with Other bag.

Options

10 %

Covers compaction, low spots and mud left in the bucket. 10% is typical.

2 · Material Estimates

Example result for the default values. Enter your own measurements and press Calculate.

Estimation Results

80-lb bags of sand mix
5bags

Bags of the selected mix (or portland cement bags for a site mix), waste included.

Floor Area
25sq ft
Average Thickness

Average bed thickness used for the volume.

1.25in
Mud Volume (incl. waste)
2.86cu ft
Mud Volume (cubic yards)
0.106cu yd
Sand Volume

Loose sand for a site mix.

Included in bagged mix
Sand Weight

Approximate weight of dry sand for a site mix.

Included in bagged mix
Slope Check

Slope implied by your thicknesses and floor size.

0.30 in/ft: OK

✓ Recommendations

Plan for 2.86 cu ft of mud over 25.0 sq ft at an average 1.25 in.

Notes

Sand mix (sand/topping mix) works as deck mud when mixed with less water than the bag directions, to a damp-sand consistency that holds together when squeezed.

Estimates include recommended safety waste margins. Double-check measurements before purchasing materials.

Detailed Project Guide & Calculation Methodology

Calculation Formulas & Methodology

Average Thickness of a Sloped Shower Pan

Center drain: T_avg = T_drain + ⅔ × (T_wall − T_drain) | Linear drain: T_avg = (T_drain + T_wall) ÷ 2

A center-drain pan is four sloped planes meeting at the drain, so most of the floor area sits near the thick perimeter. Averaged over the floor, the thickness lands two-thirds of the way from the drain value to the wall value. A linear drain gives one flat sloped plane, so the average is the simple midpoint.

Step-by-step

  1. 1Example: 3/4 in. at the drain, 1-1/2 in. at the walls, center drain.
  2. 2T_avg = 0.75 + ⅔ × (1.5 − 0.75) = 0.75 + 0.50 = 1.25 in.

Mud Volume

Volume (cu ft) = Area (sq ft) × T_avg (in) ÷ 12 × (1 + Waste%)

Converts the average thickness to feet and multiplies by floor area. Divide cubic feet by 27 for cubic yards, or multiply by 0.0283 for cubic meters. In metric: m³ = m² × thickness (mm) ÷ 1,000.

Step-by-step

  1. 125 sq ft × 1.25 ÷ 12 = 2.60 cu ft
  2. 22.60 × 1.10 waste = 2.86 cu ft (0.081 m³)

Bags of Pre-Mix

Bags = ⌈Volume ÷ Bag Yield⌉

Typical yields: 80-lb sand mix ≈ 0.66 cu ft, 60-lb sand mix ≈ 0.50 cu ft, 55-lb pre-blended mud bed mix ≈ 0.45 cu ft. Example: 2.86 ÷ 0.66 = 4.3, so buy 5 bags.

Site-Mixed Deck Mud (4:1 or 5:1)

Sand (cu ft) ≈ Volume; Portland (cu ft) = Sand ÷ Ratio; 94-lb bags = ⌈Portland cu ft⌉

Semi-dry deck mud packs down so the finished bed takes up about the same volume as the loose sand; the cement fills the gaps between sand grains. One 94-lb bag of portland is 1 cu ft. Sand weighs roughly 100 lb per cu ft (1,600 kg/m³) dry and loose.

How It Works

  1. 1Enter the floor length and width, or a known total area in sq ft or m².
  2. 2Choose the bed shape: sloped to a center drain, sloped to a linear drain, or flat.
  3. 3For a sloped pan, enter the thickness at the drain and at the walls; for a flat bed, enter the uniform thickness (in, mm or cm).
  4. 4Pick a mix: 80-lb or 60-lb sand mix, 55-lb mud bed mix, your own bag yield, or a 4:1 or 5:1 site mix.
  5. 5Set a waste allowance (10% is typical) and read the volume, bag count, sand quantity and slope check.

Deck Mud Coverage per Bag by Thickness

Square feet covered by one bag at each bed thickness, before waste. Yields are typical published figures: 80-lb sand mix about 0.66 cu ft (Quikrete Sand/Topping Mix data sheet), 60-lb sand mix about 0.50 cu ft, and 55-lb pre-blended mud bed mix about 0.45 cu ft (Mapei lists 5 to 6 sq ft per bag at 1 in.).

ThicknessCu ft per 100 sq ft80-lb bag (0.66 cu ft)60-lb bag (0.50 cu ft)55-lb mud bed mix (0.45 cu ft)
3/4 in. (19 mm)6.2510.6 sq ft8.0 sq ft7.2 sq ft
1 in. (25 mm)8.337.9 sq ft6.0 sq ft5.4 sq ft
1-1/4 in. (32 mm)10.426.3 sq ft4.8 sq ft4.3 sq ft
1-1/2 in. (38 mm)12.505.3 sq ft4.0 sq ft3.6 sq ft
2 in. (51 mm)16.674.0 sq ft3.0 sq ft2.7 sq ft
2-1/2 in. (64 mm)20.833.2 sq ft2.4 sq ft2.2 sq ft

Coverage = bag yield ÷ (thickness in inches ÷ 12). Divide your floor area by the coverage and round up.

Shower Pan Mud Quantities by Size

Center-drain pans sloped from 3/4 in. at the drain to 1-1/2 in. at the walls (average 1.25 in.), with 10% waste. For a site mix, the 5:1 column shows portland cement in cubic feet; one 94-lb bag is 1 cu ft, so every size up to 5×6 ft needs a single bag.

Shower sizeAreaMud with 10% waste80-lb bags60-lb bags5:1 site mix
3 × 3 ft9 sq ft1.03 cu ft230.21 cu ft portland + 103 lb sand
3 × 5 ft15 sq ft1.72 cu ft340.34 cu ft portland + 172 lb sand
4 × 4 ft16 sq ft1.83 cu ft340.37 cu ft portland + 183 lb sand
4 × 6 ft24 sq ft2.75 cu ft560.55 cu ft portland + 275 lb sand
5 × 5 ft25 sq ft2.86 cu ft560.57 cu ft portland + 286 lb sand
5 × 6 ft30 sq ft3.44 cu ft670.69 cu ft portland + 344 lb sand

Wider or longer showers need a thicker wall edge to keep 1/4 in. per foot of slope, so check the slope result for your size.

Metric Screed Calculator Table (per m²)

For a flat sand-cement screed, volume per square meter equals the thickness in meters. Quantities below are for a 4:1 sharp sand to cement mix, using about 1,600 kg/m³ for loose sand and 1,500 kg/m³ for cement, before waste. UK guidance (BS 8204) generally gives minimum screed thicknesses of about 25 mm bonded, 50 mm unbonded and 65 mm floating.

Screed thicknessVolume per m²Sand per m²Cement per m²Per 10 m²
25 mm0.025 m³40 kg9.4 kg0.40 t sand + 3.8 × 25 kg cement
40 mm0.040 m³64 kg15.1 kg0.64 t sand + 6.0 × 25 kg cement
50 mm0.050 m³80 kg18.8 kg0.80 t sand + 7.5 × 25 kg cement
65 mm0.065 m³104 kg24.5 kg1.04 t sand + 9.8 × 25 kg cement
75 mm0.075 m³120 kg28.2 kg1.20 t sand + 11.3 × 25 kg cement

Add 10% for waste and compaction. Underfloor heating screeds and proprietary screeds follow the manufacturer's thickness rules.

Worked Example: Sloped Shower Pan

  • •Shower: 5 × 5 ft, center drain, so area = 25 sq ft (2.32 m²).
  • •Run from drain to wall = 2.5 ft. At 1/4 in. per foot the walls must be at least 0.75 + 0.625 = 1.375 in.; round up to 1.5 in.
  • •Average thickness = 0.75 + ⅔ × (1.5 − 0.75) = 1.25 in. (32 mm).
  • •Volume = 25 × 1.25 ÷ 12 = 2.60 cu ft; with 10% waste 2.86 cu ft (0.081 m³, 81 L).
  • •80-lb sand mix: 2.86 ÷ 0.66 = 4.3, so 5 bags. 60-lb: 2.86 ÷ 0.50 = 5.7, so 6 bags.
  • •5:1 site mix: 2.86 cu ft of sand (about 286 lb) and 2.86 ÷ 5 = 0.57 cu ft of portland, so one 94-lb bag.

Frequently Asked Questions

✓ Pro Tips

  • •Work out the wall thickness from the slope: drain thickness + 1/4 in. for every foot from the drain to the farthest wall. A 3×5 ft shower with a center drain has a 2.5 ft run, so 3/4 in. at the drain needs about 1-3/8 in. at the far walls.
  • •Mix deck mud to a damp-sand consistency. If you squeeze a handful it should hold together and leave your palm only slightly damp; wet mud slumps and will not hold a slope.
  • •Pack the mud hard with a wood float or tamper before screeding. Loose mud settles under tile and leaves hollow spots.
  • •Mark the finished height on the walls (a level line at the perimeter) and set a screed guide around the drain so the slope stays even.
  • •Buy one extra bag. Running short mid-bed leaves a cold joint, and leftover bags keep well if stored dry.

⚠ Common Mistakes

  • •Using the midpoint of drain and wall thickness for a center-drain pan. The real average is two-thirds of the way toward the wall value, so the midpoint shorts you by about 10%.
  • •Going thinner than 3/4 in. at the drain. Thin edges of mortar crumble under foot traffic and crack the tile above.
  • •Adding too much water. Deck mud is not concrete; a pourable mix shrinks, cracks and cannot be shaped to a slope.
  • •Using play sand. Its fine, rounded grains make weak mud; use mason sand or sharp (concrete) sand.
  • •Forgetting the pre-slope in a traditional liner shower. The mortar bed under the liner needs its own 1/4 in. per foot slope, so you buy mud for two layers.

Share Your Estimate

Planning Guides & Advice

DIY Estimation Checklist

  • •Measure lengths and heights twice for accuracy.
  • •Check product labels for actual coverage rates.
  • •Order materials with a 10% buffer for cuts and waste.
  • •Account for doors, windows, and obstacles.