A square of architectural shingles takes about 260 nails at 4 nails per shingle, and a square of 3-tab shingles takes 320 (390 and 480 with a 6-nail pattern). A 20-square roof with 10% waste, 120 ft of starter and 40 ft of ridge needs about 6,072 nails: 51 coils, or most of one 7,200-nail box.

Formulas and figures reviewed · How we check our calculators

Nails are cheap, but running out halfway through a tear-off day is not. This calculator counts the field shingles from your roof area, applies your nailing pattern and adds the starter course and ridge cap, then converts the total to coils and boxes so you know exactly what to buy.

1 · Project Specifications

Roof

20

Sloped roof area, not the house footprint. Get it from the roofing calculator if needed.

Shingles

65

Only used with Custom. Printed on the bundle wrapper (pieces per square).

Follow the shingle maker's instructions; many require 6 nails in high-wind areas.

10 %

10% for simple gable roofs, 15% for hips, valleys and dormers.

Starter & Ridge

120

Total length of eaves, plus rakes if you run starter there too. Enter 0 to skip.

40

Total length capped with ridge shingles. Enter 0 to skip.

2 · Material Estimates

Example result for the default values. Enter your own measurements and press Calculate.

Estimation Results

Total Roofing Nails
6,072nails
Coils (120 nails each)

For a coil roofing nailer.

51coils
Boxes (7,200 nails each)
0.84 → buy 1
Nails per Square (field)

Before waste.

260nails
Field Shingles (with waste)
1,430shingles
Field Nails
5,720nails
Starter + Ridge Nails

Estimate: about 4 per 3 ft starter piece, 2 per ridge cap.

352nails

✓ Recommendations

Buy 1 box of 7,200 coil nails (51 coils needed).

Notes

Use galvanized roofing nails with at least a 12-gauge shank and 3/8 in. head that go 3/4 in. into the deck or fully through it (IRC R905.2.5).

Ridge caps and re-roofing over an old layer usually need longer nails (often 1-3/4 in. or more). Check the cap shingle's instructions.

Estimates include recommended safety waste margins. Double-check measurements before purchasing materials.

Detailed Project Guide & Calculation Methodology

Calculation Formulas & Methodology

Field nails

Field nails = ⌈Squares × Shingles per square × (1 + Waste %)⌉ × Nails per shingle

Architectural shingles run about 65 per square; 3-tab shingles 80 per square.

Step-by-step

  1. 120 squares of architectural shingles with 10% waste: 20 × 65 × 1.10 = 1,430 shingles
  2. 24 nails each: 1,430 × 4 = 5,720 field nails

Starter, ridge and packaging

Total = Field + Starter ft × 1.33 + Ridge ft × 4.8; Coils = ⌈Total ÷ 120⌉; Boxes = Total ÷ 7,200

120 ft of starter adds 160 nails, 40 ft of ridge adds 192: 6,072 nails, or 51 coils (0.84 of a box).

How It Works

  1. 1Enter the sloped roof area in squares, square feet or square meters.
  2. 2Choose the shingle type (or enter the pieces per square from the wrapper).
  3. 3Pick 4 or 6 nails per shingle and a waste allowance.
  4. 4Enter the starter and ridge lengths.
  5. 5Press Calculate for total nails, coils and boxes.

Roofing nails per square and per bundle

Field nails only, before waste. Bundles assume 3 per square, which is standard for 3-tab and most architectural shingles.

ShinglePieces per squareNails per square (4 nails)Nails per square (6 nails)Per bundle (4 / 6)
3-tab, 12 × 36 in.80320480107 / 160
Architectural, 13-1/4 × 39-3/8 in.6526039087 / 130
Metric architectural, 337 × 1000 mm (143 mm exposure)≈ 65≈ 260≈ 390≈ 87 / 130

Pieces per square come from the exposed area of each shingle. Check the wrapper for your product.

Nails and boxes for common roof sizes

Architectural shingles, 4 nails each, 10% waste, field nails only. Add starter and ridge nails from the calculator.

Roof sizeSquaresField nailsCoils (120)Boxes (7,200)
1,000 sq ft102,860240.4
1,500 sq ft154,292360.6
2,000 sq ft205,720480.8
2,500 sq ft257,152601.0
3,000 sq ft308,580721.2

With a 6-nail pattern, multiply the field nails by 1.5.

Code requirements for roofing nails

  • •Material: galvanized steel, stainless steel, aluminum or copper (IRC R905.2.5).
  • •Shank: at least 12 gauge (0.105 in.); head at least 3/8 in. (9.5 mm).
  • •Length: penetrate at least 3/4 in. (19 mm) into the deck, or through it where the deck is thinner.
  • •Number: at least 4 per strip shingle or 2 per individual shingle, or more if the manufacturer requires (IRC R905.2.6).
  • •Your local code and the shingle manufacturer's instructions take precedence over these model-code minimums.

Frequently Asked Questions

✓ Pro Tips

  • •Set the nailer depth on a scrap so nails sit flush, not cut into the mat.
  • •Buy an extra box rather than splitting the last one; leftover coils keep for the next job.
  • •Hand-nailing? Buy loose nails by count from the box label; nails per pound vary with length and coating.

⚠ Common Mistakes

  • •Nailing above the manufacturer's nailing zone, which lets shingles blow off.
  • •Using the house footprint instead of the sloped roof area.
  • •Using short nails over an old roof layer, so they never reach the deck.
  • •Forgetting starter and ridge nails, which can add 5–10% on a roof with long eaves and hips.

Share Your Estimate

Planning Guides & Advice

DIY Estimation Checklist

  • •Measure lengths and heights twice for accuracy.
  • •Check product labels for actual coverage rates.
  • •Order materials with a 10% buffer for cuts and waste.
  • •Account for doors, windows, and obstacles.
  • •Compare quotes from at least two suppliers.